Boeing Selects Site for New 777X Composite Wing Center
Boeing has selected its Everett, WA, site as the location for a new composite wing center for the 777X program. Boeing evaluated criteria that were designed to find the wing fabrication location that would best support the 777X business plan. The new composite wing center will be located north of the Everett factory. Boeing selected the Everett site for 777X final assembly following the International Association of Machinists & Aerospace Workers (IAM) District 751 approval of an eight-year contract extension earlier this year. As part of the contract extension, the company agreed to fabricate the parts for, and assemble, the 777X composite wings in the Puget Sound region. After studying several options, the company determined that the Everett site will meet its business needs for fabrication and assembly. The new facility will support fabrication of the 777X composite wings and will be approximately 1 million ft². Construction on the new facility is scheduled to begin later this year.
Top Stories
INSIDERManufacturing & Prototyping
How Airbus is Using w-DED to 3D Print Larger Titanium Airplane Parts
INSIDERManned Systems
FAA to Replace Aging Network of Ground-Based Radars
NewsTransportation
CES 2026: Bosch is Ready to Bring AI to Your (Likely ICE-powered) Vehicle
NewsSoftware
Accelerating Down the Road to Autonomy
EditorialDesign
DarkSky One Wants to Make the World a Darker Place
INSIDERMaterials
Can This Self-Healing Composite Make Airplane and Spacecraft Components Last...
Webcasts
Defense
How Sift's Unified Observability Platform Accelerates Drone Innovation
Automotive
E/E Architecture Redefined: Building Smarter, Safer, and Scalable...
Power
Hydrogen Engines Are Heating Up for Heavy Duty
Electronics & Computers
Advantages of Smart Power Distribution Unit Design for Automotive...
Unmanned Systems
Quiet, Please: NVH Improvement Opportunities in the Early Design...



