Boeing Selects Site for New 777X Composite Wing Center
Boeing has selected its Everett, WA, site as the location for a new composite wing center for the 777X program. Boeing evaluated criteria that were designed to find the wing fabrication location that would best support the 777X business plan. The new composite wing center will be located north of the Everett factory. Boeing selected the Everett site for 777X final assembly following the International Association of Machinists & Aerospace Workers (IAM) District 751 approval of an eight-year contract extension earlier this year. As part of the contract extension, the company agreed to fabricate the parts for, and assemble, the 777X composite wings in the Puget Sound region. After studying several options, the company determined that the Everett site will meet its business needs for fabrication and assembly. The new facility will support fabrication of the 777X composite wings and will be approximately 1 million ft². Construction on the new facility is scheduled to begin later this year.
Top Stories
INSIDERDefense
F-35 Proves Nuke Drop Performance in Stockpile Flight Testing
INSIDERMaterials
Using Ultrabright X-Rays to Test Materials for Ultrafast Aircraft
INSIDERManufacturing & Prototyping
Stevens Researchers Test Morkovin's Hypothesis for Major Hypersonic Flight...
INSIDERManufacturing & Prototyping
New 3D-Printable Nanocomposite Prevents Overheating in Military Electronics
INSIDERRF & Microwave Electronics
L3Harris Starts Low Rate Production Of New F-16 Viper Shield
INSIDERRF & Microwave Electronics
Webcasts
Energy
SAE Automotive Engineering Podcast: Additive Manufacturing
Manufacturing & Prototyping
A New Approach to Manufacturing Machine Connectivity for the Air Force
Automotive
Optimizing Production Processes with the Virtual Twin
Power
EV and Battery Thermal Management Strategies
Energy
How Packet Digital Is Scaling Domestic Drone Battery Manufacturing
Materials
Advancements in Zinc Die Casting Technology & Alloys for Next-Generation...



